Back to TourPoint 4 of 6
Credits
Toffel · Public domain
Point 4 of 60 of 6 completed
The Painted Facade on Herrengasse
Get Directions
47.0707, 15.4392
On arrival
Located at Herrengasse 3, easily recognised by the entire multi-storey street facade being covered in colourful mythological frescoes.
Look closer
Over 220 square meters of street-facing fresco paintings depicting Greco-Roman deities including Jupiter, Apollo, Mercury, Mars, Minerva, and Bacchus.
Illustrates complete architectural facadism through fresco painting and highlights micro-design elements like UNESCO street signage.
As you stroll down Herrengasse, prepare to encounter over 220 square metres of vibrant, hand-painted myth across a single building facade. Known as the Gemaltes Haus, this site historically served as the Herzogshof or ducal court. In 1742, Baroque painter Johann Mayer covered the entire street-facing wall in frescos, replacing earlier painted layers that stretched back to around 1600. Stand across the street to scan the tiers of Classical deities rendered in full colour: spot Jupiter with his thunderbolts, Apollo, Mercury, Mars, Minerva, and Bacchus. This monumental fresco transformation converted a medieval structural core into a grand public billboard, demonstrating how 18th-century Graz used decorative paint to assert cultural status without rebuilding stone walls. While admiring the wall art, take a look at the red-and-white street signs along Herrengasse. Notice how inside this UNESCO core, the traditional green enamel signs of outer districts are replaced by white plaques featuring a red border panel and the official UNESCO World Heritage emblem—a tiny micro-design nuance marking the boundaries of protected heritage.
Accessibility at this stop
No physical accessibility details are documented for this street-view stop.
These notes describe known conditions at this stop. Urban conditions can change, so assess the situation on site.
Your tour
0 of 6 completedMy location
You are here
4. The Painted Facade on Herrengasse
6 stops to complete
Next stop
5. Adaptive Reuse from Atrium to Roof Pitch
Approx. 0.22 km to the next stop